12/29/19

Last update of 2019....

Saturday I went out to look at the facility that will be doing the bodywork on the Torino. Need to go see the booth that will be used to apply the color next time. Right now we are targeting the move to the body shop for next weekend... if everything goes according to plan.

Once back at the dealership, I worked some more on the rear seat pass thru and cut the existing bracing back to make room for the new panel...













and dressed up the exposed surface where the brace overlapped the floor panel.














Next step will be to cut a relief slot into the existing braces to accept the new panel and work out the upper flanges on the pass thru panel to tie into the package tray. For some reason, the package tray drop off isn't symmetrical on either side of the centerline so the upper flanges will be different from site to side.













Gotta love a challenge!

ZEBRA 3 OUT

No comments: