12/14/15

details... part 21

Well not a lot to show for the past two weeks labor, but here are a few of the areas I've been working on and finishing up.....

Got the transmission all buttoned up and awaiting installation (GearVendors OD will come later)....














Stainless steel pedal trim all polished up, reattached to rubber pads and wrapped up awaiting installation....













Finished dressing down the excess filler/sealer at driver side rear wheelhouse and trunk drop off....





















and vacuumed out the trunk and interior cabin....




















in preparation to start the daunting task of prepping everything with the DA to get ready for applying the final coat of black to the inside of the body!

She is slowly coming together....

Don't touch that dial!!

ZEBRA 3 OUT

No comments: