5/4/15

Details.... part 11

Busy weekend but not a lot of progress reassembling the Tomato.... got the rear control arms smoothed and blasted but not before breaking the viewing window of the sand blaster, so that shut down that process.

























Was going to hang the rear sway bar brackets but remembered that I was going to re-engineer the hanger bracket mount for easier assembly (factory method a real PITA), so that got put on hold as well.
































Pulled apart the shifter floor seal and got the rubber and steel surround cleaned, prepped and ready for reassembly....



































and also cleaned up some rubber frame plugs as well as shooting new rubber on the bump stops, engine & tranny mounts as well as the steering shaft boot.






















I hope to get a replacement lens for the blast cabinet this week to get that back on line because there are still more bits and pieces to blast as well as my new back up plates for the sway bar hangers.

Don't touch that dial!

ZEBRA 3 OUT

No comments: