Finished blasting the front of the frame and suspension.....
now to disassemble the suspension and clean and detail all the components in preparation for REASSEMBLY..... Oh how I long for that process to begin!!!
Also degreased and cleaned the carrier in preparation for tear down and rebuild...
Will be ordering 3.89 gear set, bearing set and trac-lok clutch set from Yukon Gear & Axle, the rear brake components and front strut rod bushings from NAPA and the sway bar and front suspension polyurethane bushings from Energy Suspensions next week.
Man I can't wait for SOMETHING to go BACK TOGETHER!
More to come....
ZEBRA 3 OUT
4/27/14
4/18/14
Rear End... part 1
Well I got the rear end pulled apart during a short play day over the Easter holiday weekend. Backing plates, axles, axle seals pulled and carrier popped loose and draining......
Parts list created and pricing underway.
Next up, breaking down the third member....
Stay tuned.
ZEBRA 3 OUT
Parts list created and pricing underway.
Next up, breaking down the third member....
Stay tuned.
ZEBRA 3 OUT
4/12/14
Blasted... part 13
A pretty productive day today...
I was able to adapt my Craftsman shop vac to use the new style filters and attempted to repair my halogen work light so I could see what the hell I'm doing at times but I had to bring it home to troubleshoot since my multi-meter is at the house.
Got the rear end up on jack stands to drain......
and got half of the front frame sand blasted.......
Next installment I hope to finish the frame, break down the rear end and then start disassembly of the front suspension.
Until then....
ZEBRA 3 OUT
I was able to adapt my Craftsman shop vac to use the new style filters and attempted to repair my halogen work light so I could see what the hell I'm doing at times but I had to bring it home to troubleshoot since my multi-meter is at the house.
Got the rear end up on jack stands to drain......
and got half of the front frame sand blasted.......
Next installment I hope to finish the frame, break down the rear end and then start disassembly of the front suspension.
Until then....
ZEBRA 3 OUT
4/8/14
Blasted... part 12
This weekend I got the rest of the rear end pretty much cleaned up.....
a few places I didn't get 100% but I'll get them once the brakes and backing plates are removed. Next weekend, I start in on the front of the frame and the suspension.
Stay tuned.....
ZEBRA 3 OUT
a few places I didn't get 100% but I'll get them once the brakes and backing plates are removed. Next weekend, I start in on the front of the frame and the suspension.
Stay tuned.....
ZEBRA 3 OUT
Subscribe to:
Posts (Atom)