Well got the drive shaft cleared...
and started putting the 460 together... got the timing cover, water pump and oil pan installed and the exhaust ports masked so I can get the engine painted.
The water pump fasteners I got from AMK were not the correct style bolts so I held up painting the lower end until I hear from them about getting me the right ones.
I started cleaning the power steering hard lines before calling it another sweltering day!
Hopefully the correct fasteners will arrive from AMK so I can get them installed and the get the engine painted next weekend.
Until next time.....
ZEBRA 3 OUT
No comments:
Post a Comment