Well more baby steps today... got the driver side header reassembled and torqued into place, removed all the brackets and pulleys from the paint booth and lined up for installation...
u-joints installed in the drivershaft, transmission hard line bracket installed onto the crossmember, engine fan sandblasted and first coated...
along with the valve covers.
Hope to get the starter installed and start rehanging components onto the engine next weekend and maybe the wiring harness as well so I can light this baby off for the first time real soon!
Don't touch that dial...........
ZEBRA 3 OUT
No comments:
Post a Comment