and intake painted.
This weekend, bypass hose nipple installed, intake dry fit...
intake installed....
bypass hose and clamps installed and masked, water pump reinstalled then top side of engine painted...
finally, distributor installed and carb dry fit before calling it a (sweltering!!) day.
Until next week........
ZEBRA 3 OUT
No comments:
Post a Comment