Not a lot of progress to show this weekend.... located parts for cleaning, detailing and future installation, got the front sway bar links tightened, checked the header clearance around the fuel lines and rerouted them slightly...
determined course of action for header collector flanges and reducer to H pipe routing...
measured the Flowmaster mufflers to figure out mounting configuration, inserted the rubber floor plugs and sealed and installed the floor drain caps.
OH.... and took a few pictures of the monster transmission jack!
Stay tuned........
ZEBRA 3 OUT
No comments:
Post a Comment