To back up a bit, the Saturday after Christmas I got the dust shields and caliper brackets mounted to the spindles....
the muffler and tail pipe hangers reinstalled...
and the rotors masked off and painted.
On Monday, I unmasked the rotors...
painted the calipers...
installed the new rubber bumper above the lift finger on the jack assembly...
installed the power brake booster firewall bellows...
and got the transmission crossmember painted...
shot the shifter hump location on the driveshaft tunnel with the underhood black...
then hit the trunk with the first coat...
before installing the shifter hump and shooting the inside of the firewall and floor transition.....
With the spray bombs exhausted, it was time to break out the spray gun! I'll save THAT fiasco for our next installment....
Stay tuned!
ZEBRA 3 OUT
No comments:
Post a Comment